If you’re reading this, chances are you’re deep in the weeds of specifying synchronous motors for your latest project—and let’s be real, nailing the power rating is half the battle. I’ve been in the game as a synchronous motor supplier for over a decade now, and I’ve lost count of how many folks come to us panicking because they sized their motor wrong: too small, and it’ll burn out mid-operation; too big, and you’re wasting cash on extra capacity you don’t need. So today, I’m breaking down exactly how to calculate a synchronous motor’s power rating the right way, no jargon that’ll make your eyes cross. Synchronous Motor

First, let’s get one thing straight: synchronous motors don’t just “run” on power—they sync with the frequency of your power supply, which makes them perfect for applications that need tight speed control (think industrial pumps, conveyor belts, even large HVAC systems). But their power rating isn’t just a random number on a spec sheet—it’s tied straight to what your load actually needs. That means your first step is ditching the guesswork and measuring your real load demand, not just what you “think” you need.
Let’s start with the basics: power rating here refers to mechanical output power, right? Wait, no—wait, hold on. A lot of people mix up input power (what you draw from the grid) and output power (what your motor actually delivers to the load). That’s a huge mistake. Let’s clarify: the nameplate power on a synchronous motor is the continuous mechanical output power in kilowatts (kW) or horsepower (HP). The input power is always higher, because the motor has losses—copper loss, iron loss, friction, all that jazz. So when we’re calculating the needed power rating, we’re talking about that output power, not what comes out of the wall.
Step 1: Calculate Your Load’s Continuous Power Demand
This is non-negotiable. If you skip this, you’re flying blind. Let’s say you’re powering a conveyor belt moving heavy materials, or a water pump for a factory. You need to measure how much power that load consumes when it’s running normally (not when it’s starting—we’ll cover that later).
For most mechanical loads, the formula for required mechanical power is straightforward:
[ P_{mech} = \frac{(T \times N)}{9550} ]
Wait, what’s that? Let’s break it down. ( T ) is the torque your load needs (in Newton-meters, Nm), ( N ) is the motor’s rated speed (in RPM), and 9550 is a constant that converts the units right. If you’re more used to horsepower, there’s another way: multiply the torque in lb-ft by RPM, then divide by 5252. That’s the old-school formula, and it works too—no need to switch units if you’re comfortable with that.
But wait—don’t just grab torque from a spec sheet! Test your actual load if you can. I’ve seen guys use the maximum torque listed on a pump’s datasheet, only to find that their conveyor spends 80% of its time running at half that torque. That’s how you end up with an oversized motor. Use a torque wrench temporarily, or if you’re retrofitting an existing motor, check the nameplate on the old one—but make sure it’s the right size for the new load, not the old one.
Step 2: Account for Start-Up Overload
Okay, so you’ve got your continuous power number. But synchronous motors (like induction motors too, but worth noting here) need extra power to start, right? When you flip the switch, the motor has to accelerate the load from 0 RPM up to synchronous speed—this is called the “pull-up torque” or “starting torque.” If your continuous power is 10 kW, your motor needs to handle at least 1.5x that for start-up, maybe even 2x if you’re dealing with a heavy inertia load (like a large mill or a pulley with a lot of mass).
Wait, synchronous motors have a thing called “pull-out torque” too, but that’s for steady-state operation. Start-up is where a lot of sizing goes wrong. Let’s take an example: if your conveyor’s continuous power is 15 kW, your motor’s minimum power rating should be 15 kW, but if start-up torque is 200 Nm, that means you need a motor that can deliver enough torque at start to accelerate the load. If your motor’s nameplate torque is too low at start, it’ll stall, and that’s a costly headache—trust me, I’ve seen a factory shut down for 3 days because a mis-sized synchronous motor wouldn’t start their main pump.
Step 3: Factor in Efficiency (No, It’s Not Just a “Nice to Have”)
Here’s where things get tricky, and where a lot of first-time buyers mess up. The input power your system draws is higher than the motor’s output, because no motor is 100% efficient. So if your load needs 15 kW of mechanical output, the motor’s input power will be 15 kW divided by its efficiency (η). If your synchronous motor has an efficiency of 95%, that means input power is ~15.8 kW—but wait, when you’re looking at power rating, we’re still talking output power, right? But why does this matter? Because if you wire the motor for a power supply that can only deliver 16 kW, that’s fine, but if you pick a motor with lower efficiency (say 90%), you’ll need a higher input power, which might mean you have to upgrade your electrical circuit.
Wait, why are synchronous motors great here? They have higher efficiency than induction motors, especially at medium and large sizes—so that’s a plus for your bottom line. When calculating, make sure you’re using the rated efficiency of the motor you’re considering, not the average, because efficiency drops a bit when you’re not at full load.
Step 4: Correct Power Factor (Synchronous Motors’ Superpower)
Here’s a fun one: synchronous motors don’t just consume power—they can also correct the power factor of your entire plant. Unlike induction motors, which have a lagging power factor, synchronous motors can operate at a leading power factor, which means they can offset the lag from other equipment (like transformers, lighting, other motors). So when you’re calculating power rating, you might not just be sizing for your load—you might be sizing to improve your plant’s power factor, which can save you money on utility bills.
Wait, hold on—don’t confuse this with power rating. The power factor is a separate value, but it affects the apparent power (kVA) that your motor draws from the grid, which is important for sizing your breaker and wiring. But the motor’s power rating (kW) is still the mechanical output. For example, a 100 kW synchronous motor can have a power factor of 0.8 leading, so its apparent power is 125 kVA—but its power rating is still 100 kW. That’s a key distinction. If you ignore power factor, you might size your breaker too small, which is a fire hazard, but it won’t make your motor underpowered. But it’s a critical part of the process, so don’t skip it.
Common Mistakes We See All the Time
Let’s talk about the stuff that trips people up, because I’ve heard these questions a hundred times:
-
“I have a 20 HP motor already—can I just replace it with the same size?”
Not necessarily! If the old motor was an induction motor and the new one is synchronous, their power ratings are the same (20 HP = ~15 kW), but synchronous motors have different torque characteristics. The old motor might have been fine for the old load, but if your load changed, that same size might not work. Always recalculate, don’t just swap numbers. -
“What if my load is variable?”
If your conveyor runs at different speeds (or your pump has variable flow), you need to size for the peak power demand, not the average. Variable speed drives (VSDs) can help here, but synchronous motors paired with VSDs give you even better control. Just make sure the motor’s power rating is at the peak, not the average—otherwise, it’ll overload when the load spikes. -
“Do I need to account for altitude?”
Yes! If you’re installing the motor at high altitude (above 1000 meters / 3280 feet), the air is thinner, so cooling is less effective. That means you need to derate the motor’s power rating by about 3% for every 1000 meters above 1000 m. So if you’re at 2000 m, a 100 kW motor is actually only ~94 kW of usable power. I’ve had clients in the Rocky Mountains who forgot this, and their motors burned out in a month—so don’t skip altitude.
How We Help (As a Synchronous Motor Supplier)
Here’s the thing: I don’t just sell motors. When a customer comes to us and says “I need a synchronous motor for my 15 kW pump,” I don’t just grab a 15 kW motor and send it. I ask them: what’s the start-up torque? What’s your operating speed? What’s your altitude? Do you need power factor correction? Because a 15 kW motor for a low-altitude indoor application is way different than a 15 kW motor for a high-altitude mine with heavy start-up loads.
We’ll also provide you with a load calculation worksheet if you need it—no sales pitch, just a tool to make sure you get the right size. And if you’re not sure about your load, we can help you measure it, or suggest a motor that has a bit of extra capacity for future upgrades (like if you expand your production line, you won’t have to replace the motor right away).
Quick Example to Tie It All Together
Let’s say you’re installing a new conveyor for your warehouse. You measure the load torque at full speed: 100 Nm, and it runs at 100 RPM. Using that first formula: (100 × 100) / 9550 ≈ 1.05 kW. That’s your continuous power demand. But your conveyor is heavy—you measured start-up torque at 200 Nm, so you need 2x that continuous power for start-up, so minimum 2.1 kW. But wait, add 10% for altitude (you’re at 1500 m) and 5% for future load growth, so 2.1 × 1.1 × 1.05 ≈ 2.43 kW. So your synchronous motor should be at least 2.5 kW. That’s way simpler than guessing, right?
Final Pro Tips
- Always use SI units (kW, Nm, RPM) if you can—less conversion math. If you stick to imperial, just remember 5252 is your constant for HP.
- Don’t forget about duty cycle: if your motor runs 24/7 (like a factory pump), it needs a higher power rating than one that runs 8 hours a day. Continuous duty vs. intermittent duty makes a big difference.
- Check the motor’s speed: synchronous motors run at a fixed speed (synchronous speed = 120 × frequency / number of poles). So if you need a specific speed, make sure you pick a motor with the right number of poles, or pair it with a VSD if you need to adjust speed (though synchronous motors with VSDs are still synchronous, just variable speed).

Okay, that’s the rundown. If you’re still not sure what power rating you need, or you want to chat through your specific application—whether it’s a pump, conveyor, mill, or any other industrial load—hit us up for a supply and procurement discussion. We’ve got the expertise to get you the right motor without the guesswork, and we’re here to answer any questions you have.
DGSM BL / BL VF Subseries Motor References
- Fitzgerald, A. E., Kingsley, C., & Umans, S. D. (2003). Electric Machinery (6th ed.). McGraw-Hill.
- Bose, B. K. (2006). Power Electronics and Variable Frequency Drives: Technology and Applications. IEEE Press.
- NEMA Standard MG 1-2021: Motors and Generators. National Electrical Manufacturers Association.
Shenyang Electric Machine Manufacturing Co., Ltd.
Shenyang Electric Machine Manufacturing Co., Ltd. is one of the most professional synchronous motor manufacturers and suppliers in China. With abundant experience, we warmly welcome you to buy high quality synchronous motor at competitive price from our factory. If you have any enquiry about quotation, please feel free to email us.
Address: No.24, Kaifa 24th Road, Shenyang, Liaoning Province, China, 110142
E-mail: cndk@cndk-cn.com
WebSite: https://www.cndk-en.com/